Estimate Progress

Project Details

Client information and project scope

Permit Estimates

Enter your city's permit fees β€” saved automatically

Check the permits needed and type in your city's actual fee. Fees save automatically.

$
$
$
$
$
Permit Total: $0.00

Photo Capture ✨ AI

Capture and analyze project photos


Video Recording

Voice Input ✨ AI

Record project notes and details

Describe what you need β€” tap the 🎀 on your keyboard to dictate, or type it out. Example: "Install 1 interior door, 2 bathroom faucets, and 1 toilet"

Job Assemblies

Pre-built scope packages for common projects

Select a pre-built assembly to quickly add all standard items for that project type.

Search Parts

Find materials in the parts database

Templates

Save and load project templates

203K SOR Import

Upload FHA 203(k) Scope of Work PDF

Upload a 203(k) consultant's Scope of Work PDF. AI will detect repair items and match them to your parts database for quick bidding.

Upload 203(k) Scope of Work

Supports Standard & Limited SOR documents

Roofing Calculator

Calculate roofing materials by square footage

Enter roof dimensions to auto-calculate materials. If cedar shake is discovered, it will add tear-off and re-decking with 1/2" OSB.

Measure footprint Γ— pitch factor, or use total measured roof area

Blueprint Takeoff ✨ AI

Upload floor plan and measure spaces

Upload a blueprint to begin

Michigan Tax & Compliance

Tax breakdown and regulatory requirements

Michigan Construction Tax Requirements:

  • Sales Tax: 6% on materials
  • Contractor License: Required for >$1,000 projects
  • Workers' Comp Insurance: Required
  • Lien Law: Subcontractors must file notices
  • Payment Bond: Required on public projects >$50,000
Subtotal: $0.00
Sales Tax (6%): $0.00
Total with Tax: $0.00

MIOSHA Safety Requirements:

  • Fall protection for heights >6 ft
  • Scaffolding inspection required
  • Hard hats and PPE mandatory
  • Site safety plan required
  • Incident reporting within 8 hours

Change Orders

Create and manage project modifications

Total Change Orders: 0
Net Change Total: $0.00

Project Items

Line items and costs

Items List 0 items
Subtotal: $0.00

Estimate Results

Final costs and summary

Materials Subtotal: $0.00
Markup (Standard): $0.00
Contingency (0%): $0.00
Permits: $0.00
Profit: $0.00
Total Estimate: $0.00

Client Approval

Digital signature & approval tracking

Pending Approval

By signing below, client acknowledges review of the estimate and authorizes Arise Above Construction to proceed with the described scope of work. This estimate is valid for 30 days from the date shown above.

Sign here
-

Share Estimate

Shareable links and export options

Share Via

Export Options

PDF Options

MILESTONE SPLITS (must total 100%)

Set a phase to 0 to skip it. e.g. 60/0/40 = 2-phase

Customer Portal

Generate a shareable link for your client to view the estimate online.

Business Dashboard

Revenue and project statistics

0
Total Projects
$0
Total Revenue
$0
Avg Project Value
0
This Month

Top Materials

Project Types

Revenue by Month

Project Type Breakdown

Parts Database

Estimate History

Previously created estimates